While the transit agency is blaming the contractor, the contractor is blaming the weight of the buses. The total cost will be about $2 million dollars
to repave to the right strength. I wonder how soon the pavement will deteriorate on the rest of the line that was built correctly. Does anyone know how long until they fixed the Pittsburgh busway? I can't seem to find any information on it.
3 comments:
Maybe it's time they put the tracks backs!
Not sure if they have repaved the Pittsburgh Busway (East). That was built in 1984 and the concrete looks it - though spot work was done in summer 08.
I keep hoping that it's a conspiracy to let the concrete fall into such disrepair that the gap to put rail in is not as wide and this a more attractive option... yeah right - like that would happen.
And if they have to repair it this regularly, maybe it won't be such a huge inconvenience to shut the line down for a bit to rebuild the tracks. I wonder how much more expensive rails really are compared to all the maintenance a dedicated paveway requires (and don't forget the much shorter lifespan of the buses, their limited capacity, and slower speed).
Post a Comment