The new eastside loop will get a new color, and ridership is up to its highest ever. I still think if they had 6 minute headways morning peak to evening peak you could get a ton more riders. But that I believe is a budget issue.
1 comment:
Anonymous
said...
Both budget and size of the fleet.
But when we open the "loop route" in 2011 or so, the downtown segment will be served by two lines, both at 12 minute headways, so we'll effectively have 6 minute headways in the overlap segment.
1 comment:
Both budget and size of the fleet.
But when we open the "loop route" in 2011 or so, the downtown segment will be served by two lines, both at 12 minute headways, so we'll effectively have 6 minute headways in the overlap segment.
Post a Comment